Our priority service

Residential Drywall Installation Across the Niagara Region

St Catharines Elite Drywall is a drywall specialist installing gypsum board in homes across the Niagara Region. We work for homeowners finishing a basement, builders closing in a new build, and renovation contractors who need one trade they do not have to supervise. Drywall is the only work we do.

A full installation means we supply and deliver the board, hang it on your walls and ceilings, fit corner bead at every outside corner, then tape, mud and sand to a paint-ready Level 4 or Level 5 finish. We handle 1/2" board on standard walls, 5/8" Type X where fire separation or sag resistance matters, moisture-resistant board in bathrooms, and cement board behind tile.

More than twenty years and over 1,500 completed jobs across Niagara. Fully insured with $2M liability, WSIB covered, with WHMIS and Working at Heights certification on every crew.

Get a free quote

20+
years in the trade
1,500+
jobs completed
$2M
liability insurance
WSIB
fully covered

Our residential drywall installation services

Residential drywall installation is the supply, hanging and finishing of gypsum board to create the interior wall and ceiling surfaces of a home. It starts once framing, electrical, plumbing and HVAC rough-ins are complete and inspected. It ends with a flat, sanded surface your painter can prime the same day.

We take on four kinds of residential work. Basement finishing is the most common in this region, followed by new build boarding for small builders.

Additions and garage conversions make up the third. Full-home reboards during gut renovations are the fourth.

What is included in every job: board supply and delivery, layout planning, hanging on walls and ceilings, corner bead installation, three coats of joint compound, sanding, and a raking-light inspection before handover. What is not included: framing, insulation supply, electrical, and painting. We coordinate with those trades rather than replacing them.

Get a free quote on your project

Open stud framing in a Niagara home, inspected and ready for the drywall crew to start boarding

How a drywall installation runs, stage by stage

A typical Niagara home takes two to three weeks from first board to paint-ready. The hanging is fast. The finishing is what takes the time, because compound has to dry between coats.

  • 1. Site check and written quote

    We measure the board surface area, check access and stair width, and confirm what is already roughed in. Usually about an hour on site. You get a written quote stating scope and finish level.

  • 2. Material delivery and layout planning

    Board is delivered and distributed through the space. We plan sheet layout to keep butt joints away from door and window openings, where movement concentrates and cracks start.

  • 3. Board hanging

    Ceilings first, then walls, so wall sheets support the ceiling edge. Screws set to just below the paper surface without tearing it. Two to five days for a house, one to two for a basement.

  • 4. Corner bead and first coat

    Bead is fastened at every outside corner, then tape is embedded in compound at every joint and screw heads are covered.

  • 5. Second and third coats

    Wider knives each pass, feathering the joint out further. Each coat needs roughly 24 hours to cure properly.

  • 6. Sanding and raking-light inspection

    We run work lights across every surface at a low angle. Raking light shows ridges and missed screws that are invisible under normal lighting.

Board types and where each one belongs

The board specified for a room matters more than most homeowners expect. Using the wrong type is the most common shortcut we are called in to fix.

  • Standard 1/2" gypsum board

    The default for interior walls in living space. Brands we use regularly include CertainTeed, CGC and Georgia-Pacific ToughRock. On walls with studs at 16" on centre, 1/2" is entirely adequate and there is no benefit to paying for thicker board.

  • 5/8" Type X on ceilings and fire separations

    Type X contains glass fibre that holds the board together longer under fire exposure. The Ontario Building Code requires a fire separation between an attached garage and the living space, and between dwelling units. We use 5/8" on ceilings as standard regardless of code, because it resists sagging between joists far better than 1/2" over the years.

  • Moisture-resistant board in wet rooms

    Often called green board. It belongs in bathrooms, laundry rooms and most below-grade walls. It is not a tile backer and it is not waterproof.

  • Cement board behind tile

    In a shower or tub surround, cement board such as Durock or HardieBacker goes behind the tile. Standard board fails there eventually no matter how good the tile work is.

Choosing a finish level

Finish level is defined by the gypsum industry standard GA-214, running from Level 0 to Level 5. For a home, the real decision is Level 4 or Level 5, and it is the choice that costs homeowners the most money when it is answered badly.

  • Level 4

    is tape embedded in compound plus two further coats, sanded. It suits flat, matte and eggshell paint, which covers the large majority of Niagara homes. Bedrooms, hallways, family rooms and finished basements are Level 4 work.

  • Level 5

    adds a thin skim coat across the entire surface, not just the joints. It matters in three situations: gloss or semi-gloss paint, very large uninterrupted wall runs, and rooms where strong side light rakes across a wall from a big window.

    Outside those three situations, Level 5 is money you will not see. We tell clients that on site rather than quoting it and staying quiet.

Basement finishing in Niagara homes

Basements are the single most common residential drywall job in this region, and they are not simply a smaller version of upstairs work.

Below grade, the vapour barrier and insulation behind your board decide whether the finished space stays dry. We will not board over insulation that has not been inspected, because covering uninspected work means opening it back up.

Moisture-resistant board belongs on below-grade walls in most Niagara basements. Ductwork, beams and plumbing runs need bulkheads built and finished cleanly, and bulkhead detailing is where the difference between a good basement and a rough one shows most.

Basement finishing requires a building permit in every Niagara municipality. The permit covers the whole project and the drywall stage falls under it.

What drywall installation costs in Niagara

What moves a quote up or down:

For a full breakdown by room and job type, see our Niagara drywall cost guide.

Project Typical range
Supply, hang, tape and Level 4 finish $2.00 to $3.50 per sq ft of board surface
Basement, 700 to 900 sq ft finished area $6,000 to $11,000
Full home, roughly 2,000 sq ft $18,000 to $30,000
Single room or addition $1,800 to $4,500
  • Ceiling height, since anything above eight feet needs staging and slows every stage
  • Board thickness and any specialty board required
  • Finish level, with Level 5 adding meaningfully to finishing time
  • How many corners, angles, bulkheads and openings the layout contains
  • Access, stairs and how far board has to be carried
  • Whether existing material has to come out first

What goes wrong when drywall is installed badly

These are the failures we are most often called in to correct, and the ones an inexperienced installer will not anticipate.

  • Screw pops

    Screws set too deep tear the paper facing and lose their grip. The fastener then backs out as framing dries through the first heating season.

  • Butt joints in the wrong place

    A butt joint is where two factory-cut sheet ends meet, and it has no tapered recess to hide the tape. Placed above a door opening, it will crack.

  • Boarding before the house is heated

    Joint compound will not cure properly below about 10°C. A January job in an unheated Niagara house takes far longer or fails outright.

  • Standard board behind tile

    It absorbs moisture through the grout, swells, and the tile lets go.

  • No control joints on long runs

    Ceilings over about 15 metres need a control joint to absorb seasonal movement. Without one the crack decides its own location.

What we handle and what needs to be ready

  • We provide

    all board and materials, hanging, corner bead, taping, finishing to your chosen level, and cleanup of our work areas.

  • You or your GC provides

    framing complete and inspected, electrical and plumbing rough-ins finished, HVAC installed, blocking in place for anything mounted later, and heat in the space if we are working through a Niagara winter.

Our workmanship warranty

We warrant our workmanship and put the terms in writing on every quote. If a seam opens or a screw pops because of how we installed it, we come back and fix it at no charge.

Some hairline movement in a new build is normal as a house settles through its first heating season, and that is a touch-up rather than a defect. A seam that opens properly is a workmanship issue and we treat it as one.

Get a free quote on your project

Installer lifting a drywall panel onto bedroom wall studs during a residential installation

Get a free quote on your drywall installation

Tell us what you are building and where you are in the process. We will come out, measure, and give you a written quote with the scope and the finish level clearly stated.

Request a quote online.

Residential Drywall Installation on a Niagara jobsite

A few stages from recent work. Every job ends with a raking-light inspection before we call it finished.

  • New drywall sheets delivered and stacked in an empty room before board hanging starts
  • Screwing 5/8 inch drywall to ceiling joists, set flush so no screw pops show through the finish

Frequently asked questions

How long does drywall take for a full house?

Two to three weeks for a typical Niagara home. Roughly a week of hanging, then one to two weeks of taping and finishing, because each coat needs a day to dry. A basement usually runs one to two weeks.

Do I need to be home while you work?

No. Most clients give us access and carry on with their week. We will need you reachable for decisions, and we prefer you walk the space with us before the final coat.

Can you work around my other trades?

Yes, and it is normal. We coordinate with electricians, plumbers and HVAC crews regularly. Everything needs to be roughed in and inspected before we board.

What thickness of drywall do you use on ceilings, and why?

5/8" as standard. It resists sagging between joists over the years far better than 1/2", which is why the small extra material cost is worth it every time.

Do you handle the painting too?

No. We hand over a properly finished, sanded, paint-ready surface. We are happy to recommend painters in the region who are used to working behind us.

Do I need a permit for drywall?

Not for drywall on its own. The larger project it belongs to, such as a basement finish or an addition, needs a building permit, and that permit covers the drywall stage.

What happens if a seam cracks after a year?

Call us. Some hairline movement in a new build is normal as the house settles. A seam that opens properly is a workmanship issue and we come back and fix it.

Can you install drywall over existing plaster?

Often yes. Boarding over sound plaster with 3/8" or 1/2" board is a common approach in older Niagara homes. If the plaster is loose from the lath behind it, it has to come off first.

Related work

Services that often go with this one

Residential Drywall Installation across the Niagara Region

We cover every town in Niagara from our shop on Vine Street in St. Catharines. These are the areas where this service comes up most.

Get a free quote on residential drywall installation

Tell us what you are dealing with and roughly where in Niagara you are. For repairs, a photo is usually enough for a number without a site visit.

Call (289) 723-3544