Drywall Taping & Finishing
Taping, mudding and sanding to Level 3, 4 or 5. The half of the job everyone can see once the paint is on.
Drywall Taping & Finishing ›St Catharines Elite Drywall is a drywall specialist installing gypsum board in homes across the Niagara Region. We work for homeowners finishing a basement, builders closing in a new build, and renovation contractors who need one trade they do not have to supervise. Drywall is the only work we do.
A full installation means we supply and deliver the board, hang it on your walls and ceilings, fit corner bead at every outside corner, then tape, mud and sand to a paint-ready Level 4 or Level 5 finish. We handle 1/2" board on standard walls, 5/8" Type X where fire separation or sag resistance matters, moisture-resistant board in bathrooms, and cement board behind tile.
More than twenty years and over 1,500 completed jobs across Niagara. Fully insured with $2M liability, WSIB covered, with WHMIS and Working at Heights certification on every crew.
Residential drywall installation is the supply, hanging and finishing of gypsum board to create the interior wall and ceiling surfaces of a home. It starts once framing, electrical, plumbing and HVAC rough-ins are complete and inspected. It ends with a flat, sanded surface your painter can prime the same day.
We take on four kinds of residential work. Basement finishing is the most common in this region, followed by new build boarding for small builders.
Additions and garage conversions make up the third. Full-home reboards during gut renovations are the fourth.
What is included in every job: board supply and delivery, layout planning, hanging on walls and ceilings, corner bead installation, three coats of joint compound, sanding, and a raking-light inspection before handover. What is not included: framing, insulation supply, electrical, and painting. We coordinate with those trades rather than replacing them.
A typical Niagara home takes two to three weeks from first board to paint-ready. The hanging is fast. The finishing is what takes the time, because compound has to dry between coats.
We measure the board surface area, check access and stair width, and confirm what is already roughed in. Usually about an hour on site. You get a written quote stating scope and finish level.
Board is delivered and distributed through the space. We plan sheet layout to keep butt joints away from door and window openings, where movement concentrates and cracks start.
Ceilings first, then walls, so wall sheets support the ceiling edge. Screws set to just below the paper surface without tearing it. Two to five days for a house, one to two for a basement.
Bead is fastened at every outside corner, then tape is embedded in compound at every joint and screw heads are covered.
Wider knives each pass, feathering the joint out further. Each coat needs roughly 24 hours to cure properly.
We run work lights across every surface at a low angle. Raking light shows ridges and missed screws that are invisible under normal lighting.
The board specified for a room matters more than most homeowners expect. Using the wrong type is the most common shortcut we are called in to fix.
The default for interior walls in living space. Brands we use regularly include CertainTeed, CGC and Georgia-Pacific ToughRock. On walls with studs at 16" on centre, 1/2" is entirely adequate and there is no benefit to paying for thicker board.
Type X contains glass fibre that holds the board together longer under fire exposure. The Ontario Building Code requires a fire separation between an attached garage and the living space, and between dwelling units. We use 5/8" on ceilings as standard regardless of code, because it resists sagging between joists far better than 1/2" over the years.
Often called green board. It belongs in bathrooms, laundry rooms and most below-grade walls. It is not a tile backer and it is not waterproof.
In a shower or tub surround, cement board such as Durock or HardieBacker goes behind the tile. Standard board fails there eventually no matter how good the tile work is.
Finish level is defined by the gypsum industry standard GA-214, running from Level 0 to Level 5. For a home, the real decision is Level 4 or Level 5, and it is the choice that costs homeowners the most money when it is answered badly.
is tape embedded in compound plus two further coats, sanded. It suits flat, matte and eggshell paint, which covers the large majority of Niagara homes. Bedrooms, hallways, family rooms and finished basements are Level 4 work.
adds a thin skim coat across the entire surface, not just the joints. It matters in three situations: gloss or semi-gloss paint, very large uninterrupted wall runs, and rooms where strong side light rakes across a wall from a big window.
Outside those three situations, Level 5 is money you will not see. We tell clients that on site rather than quoting it and staying quiet.
Basements are the single most common residential drywall job in this region, and they are not simply a smaller version of upstairs work.
Below grade, the vapour barrier and insulation behind your board decide whether the finished space stays dry. We will not board over insulation that has not been inspected, because covering uninspected work means opening it back up.
Moisture-resistant board belongs on below-grade walls in most Niagara basements. Ductwork, beams and plumbing runs need bulkheads built and finished cleanly, and bulkhead detailing is where the difference between a good basement and a rough one shows most.
Basement finishing requires a building permit in every Niagara municipality. The permit covers the whole project and the drywall stage falls under it.
What moves a quote up or down:
For a full breakdown by room and job type, see our Niagara drywall cost guide.
| Project | Typical range |
|---|---|
| Supply, hang, tape and Level 4 finish | $2.00 to $3.50 per sq ft of board surface |
| Basement, 700 to 900 sq ft finished area | $6,000 to $11,000 |
| Full home, roughly 2,000 sq ft | $18,000 to $30,000 |
| Single room or addition | $1,800 to $4,500 |
These are the failures we are most often called in to correct, and the ones an inexperienced installer will not anticipate.
Screws set too deep tear the paper facing and lose their grip. The fastener then backs out as framing dries through the first heating season.
A butt joint is where two factory-cut sheet ends meet, and it has no tapered recess to hide the tape. Placed above a door opening, it will crack.
Joint compound will not cure properly below about 10°C. A January job in an unheated Niagara house takes far longer or fails outright.
It absorbs moisture through the grout, swells, and the tile lets go.
Ceilings over about 15 metres need a control joint to absorb seasonal movement. Without one the crack decides its own location.
all board and materials, hanging, corner bead, taping, finishing to your chosen level, and cleanup of our work areas.
framing complete and inspected, electrical and plumbing rough-ins finished, HVAC installed, blocking in place for anything mounted later, and heat in the space if we are working through a Niagara winter.
We warrant our workmanship and put the terms in writing on every quote. If a seam opens or a screw pops because of how we installed it, we come back and fix it at no charge.
Some hairline movement in a new build is normal as a house settles through its first heating season, and that is a touch-up rather than a defect. A seam that opens properly is a workmanship issue and we treat it as one.
Tell us what you are building and where you are in the process. We will come out, measure, and give you a written quote with the scope and the finish level clearly stated.
A few stages from recent work. Every job ends with a raking-light inspection before we call it finished.
Two to three weeks for a typical Niagara home. Roughly a week of hanging, then one to two weeks of taping and finishing, because each coat needs a day to dry. A basement usually runs one to two weeks.
No. Most clients give us access and carry on with their week. We will need you reachable for decisions, and we prefer you walk the space with us before the final coat.
Yes, and it is normal. We coordinate with electricians, plumbers and HVAC crews regularly. Everything needs to be roughed in and inspected before we board.
5/8" as standard. It resists sagging between joists over the years far better than 1/2", which is why the small extra material cost is worth it every time.
No. We hand over a properly finished, sanded, paint-ready surface. We are happy to recommend painters in the region who are used to working behind us.
Not for drywall on its own. The larger project it belongs to, such as a basement finish or an addition, needs a building permit, and that permit covers the drywall stage.
Call us. Some hairline movement in a new build is normal as the house settles. A seam that opens properly is a workmanship issue and we come back and fix it.
Often yes. Boarding over sound plaster with 3/8" or 1/2" board is a common approach in older Niagara homes. If the plaster is loose from the lath behind it, it has to come off first.
Taping, mudding and sanding to Level 3, 4 or 5. The half of the job everyone can see once the paint is on.
Drywall Taping & Finishing ›
Batt and blown insulation with vapour barrier detailed properly before the board goes on and hides it for good.
Drywall Insulation ›
Steel stud partitions, retail and office fit-outs, fire-rated and acoustic assemblies, worked around your trades and your schedule.
Commercial Drywall Installation ›We cover every town in Niagara from our shop on Vine Street in St. Catharines. These are the areas where this service comes up most.
Tell us what you are dealing with and roughly where in Niagara you are. For repairs, a photo is usually enough for a number without a site visit.